Home » Hive Digital Exceeds 22 EH/s in Bitcoin Mining

Hive Digital Exceeds 22 EH/s in Bitcoin Mining

Hive Digital’s Bitcoin Hashrate Hits 22 EH/s, Expands AI Cloud Data Center in Sweden 1

Hive Digital Advances Toward 25 EH/s

Hive Digital Technologies Ltd. (TSX.V: HIVE | Nasdaq: HIVE | FSE: YO0) announced Monday that it has exceeded 22 EH/s in global bitcoin-mining power—marking a 267% year-to-date increase—as it aims to strengthen its position as a leader in sustainable digital infrastructure.

On Monday, the company said its third 100-megawatt hydro-powered campus in Paraguay played a key role in reaching this milestone. The facility draws renewable energy from the Itaipu Dam, one of the world’s largest hydroelectric sources, and currently produces about 9.5 BTC per day with a fleet efficiency of 17.8 joules per terahash (J/TH).

Hive maintains a 55% mining margin after electricity costs, showcasing strong operational efficiency. The firm expects to reach 25 EH/s by U.S. Thanksgiving while targeting fleet efficiency of 17.5 J/TH.

At the same time, Hive is accelerating its AI Cloud initiative in Sweden, converting its Boden site from a Tier-1 to Tier-3 high-performance computing (HPC) facility. The upgraded data center will host 2,000 Nvidia GPUs for enterprise-grade AI workloads across the European Union.

The company said this retrofit model allows cash flow generation in roughly nine months, compared with three years for a new build. Executive chairman Frank Holmes said the milestone reflects the company’s “dual-engine” model that powers growth across Bitcoin and AI. CEO Aydin Kilic added that reusing infrastructure allows Hive to scale efficiently “all powered by renewable energy.”

Hive’s BUZZ division in Toronto will host another 2,000 GPUs in 2026, supported by a colocation partnership with Bell Canada. Across its sites, Hive expects to operate approximately 6,000 GPUs by 2026 to support AI training and inference workloads.

Founded in 2017, Hive Digital is the first publicly traded company to mine digital assets exclusively with green energy, now merging blockchain infrastructure with the accelerating AI super cycle.

FAQ

  • What is Hive Digital Technologies’ current Bitcoin-mining capacity?
    Hive has surpassed 22 EH/s in global Bitcoin-mining capacity.
  • Where is Hive expanding its AI Cloud operations?
    The company is converting its Boden, Sweden site into a Tier-3 HPC facility.
  • How many GPUs will Hive deploy for AI workloads?
    Hive will deploy 2,000 NVIDIA GPUs in Sweden and another 2,000 in Toronto by 2026.
  • What is Hive’s near-term mining target?
    The company aims to reach 25 EH/s by U.S. Thanksgiving.

Related Articles

Tether trims Bitdeer stake after AI push lifts Bitcoin mining stock. 1

Tether Trims Bitdeer Stake After AI Push

Tether-affiliated entities reported beneficial ownership of 37.7 million Bitdeer Class A shares as of June 12, equal to 19.7% of

A Second Nation Just Built a State Bitcoin Mining Pool — Oman's Omanhash.om Redraws the Map 1

Omanhash.om: Oman’s New Bitcoin Mining Pool

The Ministry of Transport, Communications and Information Technology (MTCIT) unveiled Omanhash.om on June 17, 2026. The pool is the official

Bitcoin difficulty drops 10% to lowest level since July 2025 as hashrate cools. 1

Bitcoin Difficulty Drops to Lowest Level Since July 2025

Difficulty Falls to an 11-Month Low Bitcoin miners have been navigating intense margin pressure since hashprice, the estimated daily value

Expert Flags Bitcoin's First Hashrate Bear Market as Network Sheds 145 EH/s 1

Bitcoin Hashrate Bear Market: A Closer Look

Hashprice Falls 27% in 30 Days as Miner Revenue Tightens Bitcoin’s computational strength has retreated notably since May 28, 2026,

Solo Bitcoin Miners Keep Pocketing Full Block Rewards in 2026: Here's How 1

Solo Mining: Maximize Bitcoin Rewards at Home

A Recent Solo Win Puts the Spotlight Back on Home Mining A solo miner hit a bitcoin block recently, collecting

Bitdeer Breaks Ground on 100 MW Alberta Site With on-Site Gas Power 1

Bitdeer Breaks Ground on Alberta Site for Bitcoin Mining

The company said Tuesday it broke ground near Fox Creek on a site that will combine a 101 megawatt natural