Home » Bitcoin Miner Soluna Expands in Texas with Blockware

Bitcoin Miner Soluna Expands in Texas with Blockware

Bitcoin miner Soluna expands behind-the-meter capacity in Texas through Blockware agreement. 1

Bitcoin Miner and HPC Service Provider Soluna Strengthens Texas Presence With Capacity Increase

Soluna Holdings Inc. announced it is expanding its partnership with Blockware by adding 6 MW at its Dorothy 1 site, a renewable-powered data center project in West Texas. The company said deployment began in January and is expected to be finalized by the end of February.

The latest addition marks the third expansion between the two firms, signaling continued growth within an existing footprint rather than a leap into untested territory. Soluna attributed the expansion to its ability to provide flexible, capital-efficient infrastructure at renewable-powered sites.

“Repeat expansions like this are a strong signal that our model is working,” Soluna CEO John Belizaire said, adding that the long-term alignment reflects the reliability and scalability of the company’s infrastructure. His message was clear: scale is welcome, but discipline comes first.

Blockware CEO Mason Jappa emphasized operational consistency as a priority during growth phases, stating that dependable infrastructure and rapid deployment were key reasons for continuing the partnership. In an industry where uptime is currency, reliability tends to win repeat business.

Project Dorothy operates as a behind-the-meter digital infrastructure designed to convert surplus renewable energy into computing power. Soluna works with bitcoin mining, AI and machine workloads, and high-performance computing (HPC) solutions. By expanding within an established site, Soluna said it can support customer growth while maintaining disciplined capital deployment.

Dorothy is part of Soluna’s broader pipeline of more than 1 gigawatt (GW) in renewable-first data centers intended to support HPC workloads and utilize energy that might otherwise be curtailed. The expansion may be incremental at 6 MW, but in energy infrastructure, incremental often equals intentional.

FAQ ❓

  • What did Soluna announce?
    Soluna added 6 MW of capacity at its Project Dorothy 1 site as part of an expanded partnership with Blockware.
  • Where is Project Dorothy 1 located?
    The renewable-powered site is located in West Texas.
  • When will deployment be completed?
    Deployment began in January and is expected to conclude by the end of February.
  • How large is Soluna’s broader development pipeline?
    Soluna reports a pipeline exceeding 1 GW of renewable-first data centers.

Related Articles

Tether trims Bitdeer stake after AI push lifts Bitcoin mining stock. 1

Tether Trims Bitdeer Stake After AI Push

Tether-affiliated entities reported beneficial ownership of 37.7 million Bitdeer Class A shares as of June 12, equal to 19.7% of

A Second Nation Just Built a State Bitcoin Mining Pool — Oman's Omanhash.om Redraws the Map 1

Omanhash.om: Oman’s New Bitcoin Mining Pool

The Ministry of Transport, Communications and Information Technology (MTCIT) unveiled Omanhash.om on June 17, 2026. The pool is the official

Bitcoin difficulty drops 10% to lowest level since July 2025 as hashrate cools. 1

Bitcoin Difficulty Drops to Lowest Level Since July 2025

Difficulty Falls to an 11-Month Low Bitcoin miners have been navigating intense margin pressure since hashprice, the estimated daily value

Expert Flags Bitcoin's First Hashrate Bear Market as Network Sheds 145 EH/s 1

Bitcoin Hashrate Bear Market: A Closer Look

Hashprice Falls 27% in 30 Days as Miner Revenue Tightens Bitcoin’s computational strength has retreated notably since May 28, 2026,

Solo Bitcoin Miners Keep Pocketing Full Block Rewards in 2026: Here's How 1

Solo Mining: Maximize Bitcoin Rewards at Home

A Recent Solo Win Puts the Spotlight Back on Home Mining A solo miner hit a bitcoin block recently, collecting

Bitdeer Breaks Ground on 100 MW Alberta Site With on-Site Gas Power 1

Bitdeer Breaks Ground on Alberta Site for Bitcoin Mining

The company said Tuesday it broke ground near Fox Creek on a site that will combine a 101 megawatt natural