Home » Bitcoin Mining Expansion: Soluna & Blockware Partnership

Bitcoin Mining Expansion: Soluna & Blockware Partnership

Soluna Holdings Expands Blockware Partnership to Wind-Powered West Texas Site, Topping 17 MW 1

Key Takeaways:

  • Soluna Holdings and Blockware signed a 4th expansion deal, adding 3.3 MW at Project Dorothy 1B in West Texas.
  • Blockware now holds over 17 MW across Soluna sites, making it the first customer at Dorothy 1B.
  • Soluna plans to develop Project Dorothy 3 at the Briscoe Wind Farm campus as buildout continues.

West Texas Wind-Powered Bitcoin Mining Site Gets First Customer in Blockware-Soluna Deal

The new agreement brings Blockware’s total deployed capacity across all Soluna sites to more than 17 MW. It also marks the first customer signed at Dorothy 1B, a 25 MW facility co-located with the Briscoe Wind Farm.

Soluna’s announcement said it acquired the Briscoe Wind Farm in a $53 million deal, giving the company direct control over energy production at its Project Dorothy campus. The setup runs power from the wind farm straight into the data center, cutting out grid dependence.

Deployment for the latest expansion began in March 2026. The project falls in line with Soluna’s behind-the-meter model, which channels surplus renewable energy into bitcoin mining and artificial intelligence (AI) computing workloads.

“We’re excited to expand our partnership with Blockware for the fourth time and bring them to a new site,” said John Belizaire, CEO of Soluna.

Belizaire added:

“As we scale, we remain focused on delivering reliable, renewable-powered infrastructure for AI and bitcoin mining.”

The partnership between the two companies has grown steadily. In February 2026, Soluna added 6 MW for Blockware at its Dorothy 1A site, also located in West Texas. Each expansion has built on the previous agreement rather than replacing it.

Mason Jappa, CEO of Blockware, detailed that the company’s growth has aligned with Soluna’s ability to bring new sites online. “Their ability to launch new sites allows us to deepen our partnership and scale alongside them,” Jappa remarked.

Soluna, listed on Nasdaq under the ticker SLNH, develops green data centers for computing-heavy applications. The Albany, N.Y.-based company has positioned its West Texas campus as a multi-site operation tied to the same renewable energy source.

Soluna Holdings Expands Blockware Partnership to Wind-Powered West Texas Site, Topping 17 MW 2

On Tuesday, around 10:24 a.m. Eastern time, Soluna shares were up 3.2% and over the last five trading sessions, the stock has risen more than 29%. SLNH has seen a massive 100% gain over the last 30 days of trading on Nasdaq as well. At press time a SLNH share is exchanging hands for $1.43 per unit.

With Dorothy 1B now operational for its first customer, Soluna has also announced plans to develop Project Dorothy 3 at the Briscoe campus. The company did not provide a timeline but stated further details will follow as development progresses.

The expansion adds to a growing list of bitcoin mining operators seeking direct access to low-cost, renewable energy. Behind-the-meter setups at wind and solar sites have drawn interest from miners looking to reduce power costs and improve operational stability.

Blockware operates as a bitcoin mining infrastructure provider, working with miners who need reliable hosted capacity. The company has expanded its footprint at Soluna sites across multiple contracts since the partnership began.

Related Articles

Tether trims Bitdeer stake after AI push lifts Bitcoin mining stock. 1

Tether Trims Bitdeer Stake After AI Push

Tether-affiliated entities reported beneficial ownership of 37.7 million Bitdeer Class A shares as of June 12, equal to 19.7% of

A Second Nation Just Built a State Bitcoin Mining Pool — Oman's Omanhash.om Redraws the Map 1

Omanhash.om: Oman’s New Bitcoin Mining Pool

The Ministry of Transport, Communications and Information Technology (MTCIT) unveiled Omanhash.om on June 17, 2026. The pool is the official

Bitcoin difficulty drops 10% to lowest level since July 2025 as hashrate cools. 1

Bitcoin Difficulty Drops to Lowest Level Since July 2025

Difficulty Falls to an 11-Month Low Bitcoin miners have been navigating intense margin pressure since hashprice, the estimated daily value

Expert Flags Bitcoin's First Hashrate Bear Market as Network Sheds 145 EH/s 1

Bitcoin Hashrate Bear Market: A Closer Look

Hashprice Falls 27% in 30 Days as Miner Revenue Tightens Bitcoin’s computational strength has retreated notably since May 28, 2026,

Solo Bitcoin Miners Keep Pocketing Full Block Rewards in 2026: Here's How 1

Solo Mining: Maximize Bitcoin Rewards at Home

A Recent Solo Win Puts the Spotlight Back on Home Mining A solo miner hit a bitcoin block recently, collecting

Bitdeer Breaks Ground on 100 MW Alberta Site With on-Site Gas Power 1

Bitdeer Breaks Ground on Alberta Site for Bitcoin Mining

The company said Tuesday it broke ground near Fox Creek on a site that will combine a 101 megawatt natural